Among the list of projects completed by ERGONS Project Marketing Consultant® are listed below. Key to the successful implementation of projects is the selection of an experienced and innovative team who have the technical expertise and capability to transform the study outcomes into a high - quality output.
PROJECTS
Consulting Services for Environmental Requirements of PMFTC Batangas Factory
Location: Philippines
Implementation Period: October 2023-June 2024
ON-GOING
ADB RTA-6669 – Promoting Action on Plastics Pollution from Source to Sea in Southeast Asia And Pacific Subproject 2: Prioritizing and Implementing Actions to Reduce Marine Plastic Pollution
Ta-6669 Reg
Location: Philippines
Implementation Period: December 29, 2022 – December 2024
ON-GOING
Provision of Consultancy Services of Rosehills Memorial Management Philippines Incorporated for its Environmental Compliance Obligations with DENR and LLDA
Location: Philippines
Implementation Period: October 2022- July 2024
ON-GOING
Environmental Consultancy Services for Securing ECC/IEE or CNC of PMFTC Marikina
Location: Philippines
Implementation Period: March 03, 2023 – August 31,2023
COMPLETED
LGU Bulan Sorsogon:
Procurement of Consulting Services for The Conduct of Environmental Impact Study (EIS) for the Proposed 75 tons per day (TPD) sanitary landfill in Bulan, Sorsogon
Location: Philippines
Implementation Period: December 2021 - June 2022
COMPLETED
PSHS-MC: Procurement of Consultancy Services for the Attainment of the Environmental Compliance Certificate (ECC) and Laguna lake Development Authority (LLDA) clearance for the Philippine Science High School Diliman Property
Location: Philippines
Implementation Period: October 19, 2020 – April 2023
COMPLETED
JICA-PCKK - Legal and Organizational Survey, The Project for Capacity Development in Coastal Engineering for Disaster Resiliency
Location: Philippines
Implementation Period: May 30, 2022 - September 30, 2022
COMPLETED
NIA R1: Consulting Services for Cabacanan Small Reservoir Irrigation Project-Detailed Engineering
Location: Philippines
Implementation Period: September 23, 2020 - October 2022
COMPLETED
EMB-DENR-CALABARZON – Professional Consultancy Services for The Procurement of Consulting Services for The Conduct of The Feasibility Study for The Proposed Waste Water And/ Or Sewage/Septage Treatment System
Location: Philippines
Implementation Period: January 2022 - July 2022
COMPLETED
DOE - Supply and delivery of goods and services for the Development /Enhancement of Services for Power Distribution Development System (PDDS) for Competitive Selection Process
Location: Philippines
Implementation Period: December 2019 - July 31,2020
COMPLETED
DepEd - Consultancy Services for the Preliminary and Detailed Engineering (PDE) for School Buildings Subsurface Soil Exploration Works, Guimaras and Iloilo Provinces, DepED (26 School Bldgs. in Guimaras and 48 School Bldgs. In Iloilo)
Location: Philippines
Implementation Period: January 2019 - August- September 2019
COMPLETED
AFD DILG Disaster Risk Management and Institutional Strengthening (DRMIS) Project/ Philippines
Location: Philippines
Implementation Period: October 1, 2017 - June 15,2022
COMPLETED
DENR - WB: PHI-Integrated Persistent Organic Pollutants (IPOPS) Management Project GEF GRANT NO: TF 095839: Development of Guidelines on Site Control on IPOPs Contaminated Sites, DENR
Location: Philippines
Implementation Period: March 1, 2016 - May 31, 2017
COMPLETED
AFD - Project Feasibility Study “Coastal Resilience, Disaster Risk Reduction
& Climate Change Adaptation through green-grey infrastructure in the Philippines” (E4157
Location: Philippines
Implementation Period: June 2015 - September 2015
COMPLETED
ADB - Construction Supervision of the Manatuto-Natarbora and The Laclubar Junction- Laclubar Road
Location: Philippines
Implementation Period: November 2015 - September 2017
COMPLETED
CCC- ADB TA-8493 PHI: Climate Resilience and Green Growth in Critical Watersheds CCC
Location: Philippines
Implementation Period: April 2014 - June 30, 2017
COMPLETED
DAR Progress and Process Monitoring of ARCCESS Batch1-Cycle 2 in the 1) Province of Bohol
Province of Cebu
Province of Negros Oriental and Siquijor
Province of Batangas
DAR
Location: Philippines
Implementation Period: January 2015 - March 2016
COMPLETED
ADB- PPP/IMC: Feasibility Study for ADB-
PPP Bulacan Bulk Water Supply: Conduct of Environmental Baseline Surveys for Environmental Impact Assessment, PPP Center
Location: Philippines
Implementation Period: June 2013 - August 2013
COMPLETED
Securing Environmental Permits for “NOV” Compliance for Rosehills Memorial Management Philippines Incorporated
Location: Philippines
Implementation Period: June 2013 - November 2013
COMPLETED
LOAN: VIETNAM-
Comprehensive Socio- Economic Urban Development Project in Vie Tri, Hung Yah, and Dong Dang, Vietnam
Location: Philippines
Implementation Period: August 2013 - 2017
COMPLETED
ADB TA: 8111-PHI
Climate Resilience and Green Growth in the Upper Marikina Basin Protected Landscape: Demonstrating the Eco-Town Framework
Location: Philippines
Implementation Period: November 2012 - September 2016
COMPLETED
Consulting Services for Environmental & Social Impact Assessment (ESIA) and Acquisition of Environmental Compliance Certificate (ECC) for the 440MWp / 337MWac Ground-Mounted Solar Project
Location: Philippines
Implementation Period: April 2024-October 2024
ON-GOING
Short Training Course on Polychlorinated Biphenyls Management
Location: Philippines
Implementation Period: April 2024-May 2024
COMPLETED
Tender Document Preparation in ADB Format for the Development of Wholesale Market In Andijan and Samarkand, Uzbekistan
Location: Uzbekistan
Implementation Period: January 2024-April 2024
COMPLETED