top of page

Among the list of projects completed by ERGONS Project Marketing Consultant® are listed below. Key to the successful implementation of projects is the selection of an experienced and innovative team who have the technical expertise and capability to transform the study outcomes into a high - quality output.

PROJECTS

Image by Sam Moghadam Khamseh

Consulting Services for Environmental Requirements of PMFTC Batangas Factory

Location: Philippines

Implementation Period: October 2023-June 2024

ON-GOING

Image by Sam Moghadam Khamseh

ADB RTA-6669 – Promoting Action on Plastics Pollution from Source to Sea in Southeast Asia And Pacific Subproject 2: Prioritizing and Implementing Actions to Reduce Marine Plastic Pollution
Ta-6
669 Reg
Location: Philippines

Implementation Period: December 29, 2022 – December 2024

ON-GOING

Image by Sam Moghadam Khamseh

Provision of Consultancy Services of Rosehills Memorial Management Philippines Incorporated for its Environmental Compliance Obligations with DENR and LLDA
Location: Philippines

Implementation Period: October 2022- July 2024

ON-GOING

Image by Sam Moghadam Khamseh

Environmental Consultancy Services for Securing ECC/IEE or CNC of PMFTC Marikina

Location: Philippines

Implementation Period: March 03, 2023 – August 31,2023

COMPLETED

Image by Sam Moghadam Khamseh

LGU Bulan Sorsogon:

Procurement of Consulting Services for The Conduct of Environmental Impact Study (EIS) for the Proposed 75 tons per day (TPD) sanitary landfill in Bulan, Sorsogon
Location: Philippines

Implementation Period: December 2021 - June 2022

COMPLETED

Image by Sam Moghadam Khamseh

PSHS-MC: Procurement of Consultancy Services for the Attainment of the Environmental Compliance Certificate (ECC) and Laguna lake Development Authority (LLDA) clearance for the Philippine Science High School Diliman Property

Location: Philippines

Implementation Period: October 19, 2020 – April 2023

COMPLETED

Image by Sam Moghadam Khamseh

JICA-PCKK - Legal and Organizational Survey, The Project for Capacity Development in Coastal Engineering for Disaster Resiliency
Location: Philippines

Implementation Period: May 30, 2022 - September 30, 2022

COMPLETED

Image by Sam Moghadam Khamseh

NIA R1: Consulting Services for Cabacanan Small Reservoir Irrigation Project-Detailed Engineering
Location: Philippines

Implementation Period: September 23, 2020 - October 2022

COMPLETED

Image by Sam Moghadam Khamseh

EMB-DENR-CALABARZON – Professional Consultancy Services for The Procurement of Consulting Services for The Conduct of The Feasibility Study for The Proposed Waste Water And/ Or Sewage/Septage Treatment System
Location: Philippines

Implementation Period: January 2022 - July 2022

COMPLETED

Image by Sam Moghadam Khamseh

DOE - Supply and delivery of goods and services for the Development /Enhancement of Services for Power Distribution Development System (PDDS) for Competitive Selection Process
Location: Philippines

Implementation Period: December 2019 - July 31,2020

COMPLETED

Image by Sam Moghadam Khamseh

DepEd - Consultancy Services for the Preliminary and Detailed Engineering (PDE) for School Buildings Subsurface Soil Exploration Works, Guimaras and Iloilo Provinces, DepED (26 School Bldgs. in Guimaras and 48 School Bldgs. In Iloilo)
Location: Philippines

Implementation Period: January 2019 - August- September 2019

COMPLETED

Image by Sam Moghadam Khamseh

AFD DILG Disaster Risk Management and Institutional Strengthening (DRMIS) Project/ Philippines
Location: Philippines

Implementation Period: October 1, 2017 - June 15,2022

COMPLETED

Concrete Architecture_edited.jpg

DENR - WB: PHI-Integrated Persistent Organic Pollutants (IPOPS) Management Project GEF GRANT NO: TF 095839: Development of Guidelines on Site Control on IPOPs Contaminated Sites, DENR
Location: Philippines

Implementation Period: March 1, 2016 - May 31, 2017

COMPLETED

Concrete Architecture_edited.jpg

AFD - Project Feasibility Study “Coastal Resilience, Disaster Risk Reduction
& Climate Change Adaptation through green-grey infrastructure in the Philippines” (E4157

Location: Philippines

Implementation Period: June 2015 - September 2015

COMPLETED

Concrete Architecture_edited.jpg

ADB - Construction Supervision of the Manatuto-Natarbora and The Laclubar Junction- Laclubar Road
Location: Philippines

Implementation Period: November 2015 - September 2017

COMPLETED

Concrete Architecture_edited.jpg

CCC- ADB TA-8493 PHI: Climate Resilience and Green Growth in Critical Watersheds CCC
Location: Philippines

Implementation Period: April 2014 - June 30, 2017

COMPLETED

Concrete Architecture_edited.jpg

DAR Progress and Process Monitoring of ARCCESS Batch1-Cycle 2 in the 1) Province of Bohol
Province of Cebu
Province of Negros Oriental and Siquijor
Province of Batangas 
DAR

Location: Philippines

Implementation Period: January 2015 - March 2016

COMPLETED

Concrete Architecture_edited.jpg

ADB- PPP/IMC: Feasibility Study for ADB-
PPP Bulacan Bulk Water Supply: Conduct of Environmental Baseline Surveys for Environmental Impact Assessment, PPP Center

Location: Philippines

Implementation Period: June 2013 - August 2013

COMPLETED

Concrete Architecture_edited.jpg

Securing Environmental Permits for “NOV” Compliance for Rosehills Memorial Management Philippines Incorporated
Location: Philippines

Implementation Period: June 2013 - November 2013

COMPLETED

Concrete Architecture_edited.jpg

LOAN: VIETNAM-
Comprehensive Socio- Economic Urban Development Project in Vie Tri, Hung Yah, and Dong Dang, Vietna
m

Location: Philippines

Implementation Period: August 2013 - 2017

COMPLETED

Concrete Architecture_edited.jpg

ADB TA: 8111-PHI
Climate Resilience and Green Growth in the Upper Marikina Basin Protected Landscape: Demonstrating the Eco-Town Framework

Location: Philippines

Implementation Period: November 2012 - September 2016

COMPLETED

bottom of page